TTR Worker shown bent over with a tool on the tracks

strachan avenue grade separation

Comprehensive track, signal, and system modifications completed to support the Strachan Avenue Grade Separation and ensure readiness for future rail operations.

Contact Us

strachan avenue grade separation

strachan avenue track and signal upgrades

status: completed

TTR was instrumental in facilitating the construction of the Strachan Avenue Grade Separation, TTR provided engineering support, flagging protection and Track and Signal support for the enabling works which included switch removals, Snow Clearing Devices (SCD), gas main and SCADA (snow blower monitoring system) removals and the construction of replacement tracks.

TTR undertook a number of separate but related tasks which include, but are not limited to the following;

  • The removal of cables in existing troughs

  • The removal and relocation of signal heads and associated circuits from the Strachan Avenue signal bridge

  • The testing and commissioning of all affected track circuits

  • The preparation of testing and commissioning plans

  • The work activity was in support the USRC preprartion of the Union Person train service (UP). For the project, TTR was responsible for completing the following work tasks:

  • The removal of turnouts and associated track for crossovers

  • The removal of turnouts and associated track for single switches

  • The removal of Signals

  • The construction and installation of track panels to replace turnout removals

  • The installation of forged rail at the Strachan Avenue crossing

  • The removal of rail, ties and OTM from the project site and general clean up

  • The installation of track ties on the Galt North track to cover turnout removals

  • Signal work related to the temporary Galt South track connection across Strachan Avenue

  • Signal work related to the relocation of the Strachan Avenue crossing arms

  • Conduit installation and the refeeding of cable on the south side of corridor in preparation for retaining wall installation

  • Relocation of complete signal dusting components from north side to the south side of the rail corridor

  • Relocation of existing fibre optic cable and related CCTV equipment

Image of TTR railway track workers working on a track that is in flames

Railway maintenance Services We've provided

TTR in action

Toronto Terminals Railway has delivered a wide range of railway maintenance projects including track repairs, switch upgrades, signal maintenance, and emergency response services. Each project reflects our commitment to safety, efficiency, and keeping rail systems running smoothly in all conditions.

Choose a project to learn more.

Roberts Bank Expansion - Deltaport, BC
Don Yard leads phase 1 / phase 2
strachan avenue grade separation
Switch Machines Replacement Project (SMRP)
The DSS (double Slip Switch) Project
USRC Maintenance Contract

Have Questions, want to know more?

Have questions or want to learn more about Toronto Terminals Railway, positions, or what we do? We're here to help! Reach out anytime, we're happy to provide the info you need and guide you through the opportunities we offer.