An image of train tacks and large skyscraper buildings

usrc maintenance contract

Trusted with the long-term maintenance of Union Station Rail Corridor.

Contact Us

Union station rail corridor maintenance contract

maintaining the heart of toronto's rail network

status: active

Upon the sale of the Union Station Rail Corridor (USRC), ownership of the entire track and signal infrastructure was transferred to the Province of Ontario and GO Transit (a division of Metrolinx), while the Union Station building itself was sold to the City of Toronto.

TTR retained responsibility for the operation and maintenance of the track and signal systems to ensure GO Trains continued to run safely and efficiently. Since 2000, TTR has expanded its track, signal, and operations departments to support the increased protection and oversight required for construction activities related to the anticipated growth in GO Transit service frequency.

As of July 2024, TTR continues to deliver track and signal maintenance and construction services in accordance with standards set by Transport Canada and Metrolinx engineering requirements.

As part of regular inspections of railway assets within the corridor, TTR routinely performs the following work:

  • Grinding switches and frogs

  • Welding switch points, frogs, rail ends etc.

  • Changing rail and other components of double slip switches and single switch

  • Ensuring switches are adjusted

  • Changing ties and spot surfacing

  • Building and installing panels

  • De-stressing rail

  • Ballast transport and dumping

  • Vegetation control

  • Graffiti removal

  • Debris removal

  • Rights of way fencing

  • Maintenance of railway signage

  • Emergency track repairs

  • Managing, planning and repairing all track geometry car deviations

  • Managing, planning and repairing all Rail flaw detector programs

Image of TTR railway track workers working on a track that is in flames

Railway maintenance Services We've provided

TTR in action

Toronto Terminals Railway has delivered a wide range of railway maintenance projects including track repairs, switch upgrades, signal maintenance, and emergency response services. Each project reflects our commitment to safety, efficiency, and keeping rail systems running smoothly in all conditions.

Choose a project to learn more.

Roberts Bank Expansion - Deltaport, BC
Don Yard leads phase 1 / phase 2
strachan avenue grade separation
Switch Machines Replacement Project (SMRP)
The DSS (double Slip Switch) Project
USRC Maintenance Contract

Have Questions, want to know more?

Have questions or want to learn more about Toronto Terminals Railway, positions, or what we do? We're here to help! Reach out anytime, we're happy to provide the info you need and guide you through the opportunities we offer.